一级做受毛片免费大片一级做,欧美性爱免费网站,日韩www,亚洲av网址

    <var id="0u5j5"><td id="0u5j5"></td></var>
    <u id="0u5j5"></u> <table id="0u5j5"><p id="0u5j5"></p></table>

    1. <u id="0u5j5"><small id="0u5j5"></small></u><video id="0u5j5"><mark id="0u5j5"></mark></video>

          Home | Simplified Chinese | Japanese | Korean
        English About Changzhou Mayor’s Mailbox Government Bulletin Latest News Laws and Regulations
        Diaozhuang Road reconstruction to be completed within the year
        Font:〖L M S

        On June 20th, it was informed that the Diaozhuang Road renovation project has started. Upon completion, the 7-meter-wide old road will be widened to 30 meters. The new road is expected to open to traffic within the year.

        The Diaozhuang Road, connected with the East Hebin Road in the south and the East Laodong Road in the north, is a 1,461-meter-long secondary road in Changzhou. The old cement concrete pavement has many existing cracks, dislocation and potholes, with no sidewalk on either side. There are security risks as motor vehicles, non-motor vehicles and pedestrians are traveling on the same lane.

        After the reconstruction, the road will have four lanes for motor vehicles in the middle, as well as non-motor vehicle lanes, green belts and sidewalks on both sides. At the same time, the project will build public facilities such as rain sewers, water supply, gas pipeline, street lighting, signs and markings, landscaping, etc.

        掃一掃在手機打開當(dāng)前頁

         
        Sponsored by: General Office and Foreign Affairs Office of Changzhou Municipal People’s Government All rights reserved
        蘇公網(wǎng)安備32041102000483號 網(wǎng)站標(biāo)識碼:3204000002 蘇ICP備05003616號 Technical Support Phone:0519-85685023
        Best viewed in IE 6.0 browser with and above 1024*768 resolution.