一级做受毛片免费大片一级做,欧美性爱免费网站,日韩www,亚洲av网址

    <var id="0u5j5"><td id="0u5j5"></td></var>
    <u id="0u5j5"></u> <table id="0u5j5"><p id="0u5j5"></p></table>

    1. <u id="0u5j5"><small id="0u5j5"></small></u><video id="0u5j5"><mark id="0u5j5"></mark></video>

          Home | Simplified Chinese | Japanese | Korean
        English About Changzhou Mayor’s Mailbox Government Bulletin Latest News Laws and Regulations
        Plan of the first phase of Changzhou Metro Line 1 publicized
        Font:〖L M S

        Recently, the detailed plan of the first phase of Metro Line 1 has entered the publicity period, which is available on the official website of Changzhou Municipal Bureau of City Planning.

        It is learned that the total track length of the first phase is about 34.237 km, including underground line of 31.635 km, elevated line of 2.189 km and transition section of 0.413 km. The underground line is situated from Beihai Road to Longyue Road, comprising 27 stations; while the elevated line contains two stations. The average distance between stations is 1.2 km.

        Meanwhile, the Xinlong Depot will be constructed on the north of State Highway 122  and the east of Changjiang Road, covering an area of about 38.08 hectares (including the reserved area for rail transit and the parking area of about 29.52 hectares), which connects with the Beihai Road Station.

        掃一掃在手機(jī)打開當(dāng)前頁

         
        Sponsored by: General Office and Foreign Affairs Office of Changzhou Municipal People’s Government All rights reserved
        蘇公網(wǎng)安備32041102000483號(hào) 網(wǎng)站標(biāo)識(shí)碼:3204000002 蘇ICP備05003616號(hào) Technical Support Phone:0519-85685023
        Best viewed in IE 6.0 browser with and above 1024*768 resolution.